Residential development
Single- and double-storey homes delivered as part of Synergy’s residential development track record.
A closer look at selected Energy and Property projects — the system architecture, project scale and execution behind the finished result.
Each section focuses on selected projects with the technical or development detail behind the headline image.

Ground-mounted PV commissioned and connected under ZESCO net metering.
View project ↓
ATESS hybrid power, rooftop PV, battery storage, grid and generator integration.
View project ↓
Containerised off-grid power plant with 200 kWp PV and large-scale storage.
View project ↓
Victron backup architecture, SMA solar and approximately 168 kWh battery storage.
View project ↓
High-capacity modular battery system for a large private site.
View project ↓
Ground-mounted commercial solar PV supplied, installed and commissioned in Chisamba.
View project ↓
Sixteen 300-litre Solahart systems across the cancer hospital facility.
View project ↓
Large distributed hot-water installations serving dormitory facilities.
View project ↓
A broader track record including hotels, schools, mining accommodation, lodges and institutional facilities.
Explore track record ↓
Development, ownership, leasing, asset improvement and long-term management.
View project ↓
Eight warehouse units across two blocks with integrated mezzanine offices.
View project ↓
Residential development, townhouse delivery and asset fit-out work alongside the commercial portfolio.
Explore track record ↓Synergy supplied, installed and commissioned a 220 kWp ground-mounted PV system for the Southern Water & Sewerage pump station in Kazungula. The project uses two SMA CORE2 grid-tie inverters and was commissioned and connected under ZESCO net metering.
The project demonstrates utility-facing grid integration alongside civil mounting works, DC/AC electrical installation, commissioning and export under the net-metering framework.



A commercial hybrid system combining rooftop solar, substantial battery storage and existing site power infrastructure. Synergy integrated the ATESS platform with grid supply, generator backup, ATS arrangements and operational bypass requirements.
The project is a strong example of Synergy’s systems-integration work: generation, storage, backup and controls engineered as one operating system rather than separate equipment packages.



A complete off-grid power plant being developed around a factory-integrated containerised power system, large-format battery storage and a 200 kWp solar array.
Container fabrication and electrical integration are being coordinated with the 200 kWp PV installation, bringing the power-conversion, storage and solar-generation elements together as one off-grid system.



One Sunningdale combines a purpose-built solar carport with a large three-phase hybrid backup system, bringing the PV structure and power architecture together as one site solution.
The result demonstrates how PV can be integrated into the built environment while the inverter and battery system provides the site’s backup and hybrid-power functionality.



A completed high-capacity Sigenergy installation for a private Lusaka site, using a modular battery architecture designed for substantial backup and energy-storage requirements.
The clean plant-room installation shows the scale now available from modular high-voltage storage while retaining a compact equipment footprint.
Synergy supplied, installed and commissioned a 50 kW three-phase grid-tie solar PV system for Lukumantano Developments at a commercial farm site in Chisamba.
The project is a straightforward example of commercial agricultural PV: a purpose-built ground-mounted array designed for reliable daytime generation and grid-connected operation.



A broader sample of commissioned solar, backup and hybrid systems.
The portfolio extends beyond the flagship case studies, across commercial, agricultural, institutional and private sites.
SMA grid-tie solar with Victron three-phase backup and Solar MD battery storage.
Commercial PV with SMA grid-tie inverters, Victron backup and battery storage.
Rooftop PV with three-phase SMA Sunny Island backup and battery storage.
Sunsynk hybrid PV and battery system for commercial backup and self-consumption.
75 kW SMA Tripower solar integrated with 90 kVA Victron Quattro three-phase backup and 192 kWh of battery storage.
24 kW SMA hybrid backup system constructed with BYD battery storage for the Lusaka pump station in Mtendere.
Synergy installed sixteen 300-litre Solahart systems across the new cancer hospital development in Ndola, providing distributed commercial hot-water capacity across the facility.
The rooftop arrangement uses multiple independently serviceable systems distributed across the hospital buildings, matching the hot-water requirement to the facility layout.



Synergy delivered distributed Solahart systems serving male and female dormitory facilities at First Quantum education sites in Solwezi.
The projects demonstrate solar thermal at institutional scale, using multiple systems arranged around accommodation blocks rather than a single central plant.



Selected commercial and institutional projects beyond the detailed case studies above.
Synergy’s solar hot-water experience extends across hospitality, education, mining accommodation, healthcare, lodges and residential developments.
Solar hot-water installation serving the hotel accommodation facilities.
Commercial Solahart hot-water systems for the hotel property.
Solar water-heating systems serving accommodation blocks.
Hot-water systems serving male and female dormitories.
Large distributed solar hot-water installation for student accommodation.
Solar water-heating installations across management residential accommodation.
Garden City represents Synergy’s long-term property model: commercial development combined with direct ownership, leasing, asset enhancement and ongoing operational management.
Direct technical and management capability allows upgrades, tenant requirements and energy improvements to be assessed in the context of the asset’s long-term performance.



A two-block industrial and warehouse scheme comprising eight units, designed around practical vehicle access, warehouse frontage and integrated mezzanine office accommodation.
The development is being delivered as a long-term Synergy property asset, with the building layout, services and access designed around practical industrial use and maintainability.


Selected residential and asset-enhancement work alongside the current commercial portfolio.

Single- and double-storey homes delivered as part of Synergy’s residential development track record.

Multi-residential development comprising ten double-storey townhouses.

Tenant fit-outs, expansions and physical asset improvements coordinated with long-term ownership and operations.
Energy system, renewable project development or property enquiry — talk directly to the team.